We use cookies to improve your experience. By clicking "Accept" you agree to our use of cookies. Read our Cookie Policy.

Steelpoort Pilot — Operations Command Center

Real-time data from TFA's demonstration facility (Phase 1: 13 ha → 1 MWe)

OPERATIONAL
Phase 1: 13 ha → 1 MWe|Limpopo, SA
LAND → BIOMASS

OFI Cactus Coverage

Progress78%

1.2 ha of 13 ha target

  • • 2,419 plants established
  • • 2,500 plants/ha (pilot density)
  • • Target: 30,000 plants/ha at commercial scale
  • • 40-50 t/ha/yr biomass yield expected
BIOMASS → GAS

Anaerobic Digestion (CSTR)

Target
Q3 2026

FEED in progress

  • • FEED: 45% complete (process flow diagrams underway)
  • • 1 MWe biomethane capacity
  • • 97% CH₄ purity via upgrading
  • • Continuous feed, 21-day HRT
GAS → POWER

Jenbacher CHP Engine

Target
Q3 2026

Commissioning planned

  • • 1 MWe nameplate capacity
  • • Combined heat & power (85% total efficiency)
  • • Grid-connected via Eskom MV network
  • • 24/7 baseload operation (8,760 hrs/yr)

Steelpoort Site Map

Satellite view with planting coverage

🗺️

Loading satellite view...

Site Coverage Status

Planted & Established (1.2 ha)
Pending Planting (11.8 ha)
Infrastructure (AD, CHP, storage)

Live Metrics

Updates every 30 seconds

Live
Planting Rate
120plants/day
8.5%

Target: 150 plants/day for Q2 2026 13-ha completion

Plant Density
2,500plants/ha
2.1%

Current: Pilot config. Commercial: 30,000 plants/ha (UHD)

Avg Height
45cm
12.3%

Seasonal variation normal. Target harvest: 60-80 cm

Coverage
7.5%
0.3%

Pilot: 1.2 ha of 13 ha. Target: 100% by Q2 2026

Operational Density Targets

Optimized plant spacing by revenue stream

ACTIVE
Current Pilot
Biomass Proof-of-Concept
2,500plants/ha

Validating cultivation & harvest logistics

Ultra-High-Density (UHD)
Energy Production
30,000plants/ha

Maximizes biomethane feedstock yield

Medium-Density (MD)
AgriFood Markets
5,000plants/ha

Premium fruit & nopalitos for retail

Recent Activity

Latest updates from the field

Planting Section B3 Complete

2h ago

245 plants established, bringing total pilot coverage to 1.2 ha. On track for 13 ha completion by Q2 2026.

10,000+ Plants Milestone

1d ago

Pilot demonstrates cultivation viability across 1.2+ hectares within the 13 ha site. Next: Scale to 30,000 plants/ha (UHD) for commercial biomethane production.

Water Efficiency Validation

3d ago

Drip system maintaining 80% reduction vs. traditional bioenergy crops. 0.4 m³/ha/day — CAM photosynthesis requires minimal irrigation.